Huber Street Elementary School

Asbestos Sub-chapter 8 Design, ASCM Occupied Building Project Monitoring and Project Close-out

Boiler replacement for the school was scheduled for the Summer of 2015.  The project required the removal of all asbestos from the boiler room, and the demolition of the boiler under containment, since asbestos was identified inside the boiler. This required project design through a licensed  Asbestos Safety Control Monitor (ASCM) firm, and subsequent monitoring for compliance as a friable removal with a full containment under un-occupied building conditions. At the project’s completion, RJB authored a comprehensive remediation close-out report.